POLO – Reconstruction of the sidewalk ramps between Elkhorn and Dement streets begins Monday on state Route 26 and U.S. Route 52, and is expected to last about 2 months, the Illinois Department of Transportation said.

Traffic will be reduced to one lane at times, with flaggers directing traffic. Motorists can expect delays and should allow extra time for trips through the area.

For more local news, visit SaukValley.com at https://www.saukvalley.com.

Ogle County